Answer:
W = 100000 J = 100 KJ
Step-by-step explanation:
Here we will use the most basic and general formula of work, which is as follows:

where,
W = Work Done = ?
F = Force Required = 200 N
d = Length of Track = 500 m
Therefore,

W = 100000 J = 100 KJ