95.1k views
16 votes
Why did the runways have to be constantly repaired?

User Mora
by
4.3k points

2 Answers

10 votes

Answer:

Because it needed mantainece

Step-by-step explanation:

User RyanJohnstone
by
4.6k points
8 votes

Answer:

like this::

Step-by-step explanation:

The RRR process has developed into five stages: 1) damage assessment, 2) Minimum Operating Strip (MOS) selection, 3) Explosive Ordinance Disposal (EOD), 4) bomb damage repair, and 5) MOS set-up.

User Brunorey
by
4.6k points