Answer:
Process Breakdown Structure (PBS)
Step-by-step explanation:
Since in the question it is mentioned that WBS should be best suited for design & construction projects so there is tangible results
now if the final result should be lower tangible so here the project manager should select the project breakdown structure as the process of the project should be driven via requirement of the performance but not with the plans or the blueprints