171k views
14 votes
PLEASE HELP I WILL OFFER ALOT, A manufacturer of ski clothing makes ski pants and ski jackets. The profit on a pair of ski pants is $3 and on a jacket is $7. Both pants and jackets require the work of sewing operators and cutters. There are 60 minutes of sewing operator time and 48 minutes of cutter time available. It takes 8 minutes to sew one pair of ski pants and 4 minutes to sew one jacket. Cutters take 4 minutes on pants and 8 minutes on a jacket. The manufacturer wants to make a minimum of 4 ski pants and 2 ski jackets. Let x represent the number of ski pants. Let y represent the number of ski jackets. x > 4 y > 2 8x + 4y 96 4x + 8y 72 Find the maximum profit and the amount of pants and jackets to maximize the profit.

the manufacturer must make (blank) ski pants and (blank) ski jackets for a maximum profit of $(blank)​

1 Answer

6 votes

Answer:

79 hhj cfgghh hjjjjhjbhh

User Fabjoa
by
4.3k points