Answer:
Cost of goods manufactured= $228,700
Step-by-step explanation:
To calculate the cost of goods manufactured, we need to use the following formula:
cost of goods manufactured= beginning WIP + direct materials + direct labor + allocated manufacturing overhead - Ending WIP
cost of goods manufactured= 25,500 + (46,000 + 75,500 - 39,500) + 100,500 + (68,500 - 11,800) - 36,000
cost of goods manufactured= $228,700
We deduct the indirect material from overhead because it is already incorporated into direct materials.