Lowden Company has a predetermined overhead rate of 160% and allocates overhead based on direct material cost.During the current period,direct labor cost is $50,000 and direct materials cost is $80,000.How much overhead cost should Lowden Company should apply in the current period?

A) $31,250.
B) $50,000.
C) $80,000.
D) $128,000.
E) $208,000.

User Bevor
by
2.6k points

1 Answer

22 votes
22 votes
I think it would be C
User Kjones
by
2.7k points