Answer:
85%
Step-by-step explanation:
With regards to the information above, predetermined overhead will be computed as;
Predetermined overhead = (Estimated overhead / Expected labor cost) × 100
Estimated overhead = $85,000
Expected labor cost = $100,000
Then,
Predetermined overhead = ($85,000 / $100,000) × 100
Predetermined overhead = 85%
Therefore, its predetermined overhead rate for the next period should be 85%