A relief vent is required for a waste stack having more than ___________ branch intervals. a. 16 b. 5 c. 8 d. 10
asked
Dec 18, 2024
162k
views
3
votes
A relief vent is required for a waste stack having more than ___________ branch intervals. a. 16 b. 5 c. 8 d. 10
Engineering
college
GaryL
asked
by
GaryL
7.8k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
6
votes
A relief vent is required for a waste stack having more than 16 branch intervals.
Jan Wendland
answered
Dec 25, 2024
by
Jan Wendland
8.2k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
Aug 4, 2024
103k
views
A soil or waste stack may be used at a relief vent provided that
Qcom
asked
Aug 4, 2024
by
Qcom
7.1k
points
Engineering
college
1
answer
0
votes
103k
views
asked
Oct 9, 2024
92.3k
views
A(n) ___________ can connect several vent stacks and stack vents and then extend through the roof to atmosphere. a. Relief vent b. Collector vent c. Main vent d. Circuit-vented
Matt Dodge
asked
Oct 9, 2024
by
Matt Dodge
8.6k
points
Engineering
college
1
answer
3
votes
92.3k
views
asked
Feb 5, 2024
32.6k
views
What features are generally associated with a main supply pipe? (Select all that apply.) waste stack water meter vent stack main shut-off valve
Kaspersky
asked
Feb 5, 2024
by
Kaspersky
8.8k
points
Advanced Placement (AP)
college
1
answer
4
votes
32.6k
views
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.4m
questions
12.2m
answers
Other Questions
A piston-cylinder device fitted with stops in the cylinder walls contains 2.1 kg of water initially at 150 kPa and 30 °C. Heat is transferred to the system until the final temperature reaches 250 °C. The
4. Which of the following is the first thing you should do when attempting to park? A. Securing the parking spot by standing in it B. Turning on your hazard lights C. Confirming the space can fit your
An activated sludge plant is being designed to handle a feed rate of 0.438 m3 /sec. The influent BOD concentration is 150 mg/L and the cell concentration (MLVSS) is 2,200 mg/L. If you wish to operate the
The bulk modulus of a fluid if it undergoes a 1% change in volume when subjected to a pressure change of 10,000 psi is (a) 0.01 psi (b) 0.001 psi (c) 0.00001 psi (d) 0.000001 psi (e) none of these
A car has an initial speed of 10 m/s. It then undergoes a constant acceleration of 0.05 m/s^2 over a distance of 5 km. Determine: a) The car final speed. b) The time needed to travel the 5 km.
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qammunity