Answer:
4 days
Explanation:
work of first pool in a day = 1/6
work of the second pool in a day = 1/12
if they work together
1/6 + 1/12 = (2+1)/12 = 3/12 in a day
3/12 · 4 = 12/12 (the entire work)
So it takes 4 days