212k views
5 votes
On a coordinate plane, the x-axis is labeled Time (hours) and the y-axis is labeled Cost (dollars). A step function. Step 1 has white dot (0, 3) and black dot (2, 3), step 2 has white dot (2, 6) and black dot (4, 6), step 3 has white dot (4, 9) and black dot (6, 9), step 4 has white dot (6, 12) and black dot (8, 12), step 5 has white dot (8, 15) and black dot (10, 15). The graph above represents a step function. A graph of a step function resembles the steps of a staircase and is not continuous. The black dot represents a closed endpoint (to include) and the white dot represents an open endpoint (do not include). Utilizing the graph, how much does it cost to park for 121 mins? a. $3 c. $9 b. $6 d. $12

User Dwhite
by
8.0k points

1 Answer

3 votes
Based on the given information and the graph, we can determine the cost to park for a specific time duration.

Looking at the graph, we can see that each step has a duration of 2 hours and the cost increases by $3 with each step.

To determine the cost for 121 minutes (or approximately 2 hours and 1 minute), we need to identify the step that includes this time duration.

Since each step has a duration of 2 hours, we can see that the black dots represent the closed endpoints, including the time indicated.

The second step, which ranges from 2 to 4 hours (black dots at (2, 3) and (4, 6)), does not include the 121-minute mark.

The third step, which ranges from 4 to 6 hours (black dots at (4, 6) and (6, 9)), also does not include the 121-minute mark.

Therefore, the cost for parking for 121 minutes falls within the first step, ranging from 0 to 2 hours (white dot at (0, 3) and black dot at (2, 3)).

Hence, the cost to park for 121 minutes is $3. Therefore, the correct answer is option a. $3.
User Stofl
by
8.5k points

No related questions found

Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.

9.4m questions

12.2m answers

Categories