If the electricity cost is $2 per machine hour and it took 2 machine hour to assembly a car, then this cost is A. Variable Cost, Direct Cost, Direct Materials B. Variable Cost, Product Cost, Direct Cost, C. Product Cost, Period Cost, Direct Cost D. Variable Cost, Indirect Cost, Manufacturing Overhead