Final answer:
The number of pounds of Material A and Material B required for August production is 216,000 lb. of A; 36,000 lb. of B.
Step-by-step explanation:
The number of pounds of Material A and Material B required for August production is 216,000 lb. of A; 36,000 lb. of B.
To calculate the total pounds of Material A required, we can use the following formula:
Total pounds of Material A = Estimated inventory on August 1 + Expected sales volume - Desired inventory on August 31.
Substituting the given values, we get: Total pounds of Material A = 12,000 + 75,000 - 9,000 = 78,000 lb.
Similarly, to calculate the total pounds of Material B required, we can use the same formula:
Total pounds of Material B = Estimated inventory on August 1 + Expected sales volume - Desired inventory on August 31.
Substituting the given values, we get: Total pounds of Material B = 12,000 + 75,000 - 9,000 = 78,000 lb.