Given the following assembly line using five workers, working one tenhour shift per day, 5 days per week: What is the balance delay of this line? a. Greater than .30 but less than or equal to .40 b. Greater than .20 but less than or equal to 30 c. Ledss than or equal to .20 d. Greater than .40

User Mdma
by
8.2k points

1 Answer

4 votes

Answer;

As we need to find the answer correct to two decimal places, we

can make a final estimate as being slightly less than -1.2. Hence, we can write:$$log(0.4)

\approx -1.2$$The correct answer is approximately -1.2 or -.39 approximately.