In a construction project, the __________ is the list of work items that are identified during a final inspection that need to be completed.
Ask a Question
Questions
Unanswered
Tags
Ask a Question
In a construction project, the __________ is the list of work items that are identified during a final inspection that need to be completed.
asked
Aug 17, 2024
218k
views
0
votes
in a construction project, the __________ is the list of work items that are identified during a final inspection that need to be completed.
Engineering
college
Jon Ross
asked
by
Jon Ross
7.6k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
1
vote
Answer:
punch list
Step-by-step explanation:
..............
Tim Norman
answered
Aug 22, 2024
by
Tim Norman
8.0k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
No related questions found
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.4m
questions
12.2m
answers
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
4. Which of the following is the first thing you should do when attempting to park? A. Securing the parking spot by standing in it B. Turning on your hazard lights C. Confirming the space can fit your
A water towers lowest point is 405 ft and the main line is 6 feet below the ground. The ground elevation is at 276 ft. The main line travels 2.9 miles. The pipe will travel through the following flanged
An activated sludge plant is being designed to handle a feed rate of 0.438 m3 /sec. The influent BOD concentration is 150 mg/L and the cell concentration (MLVSS) is 2,200 mg/L. If you wish to operate the
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qammunity.org