SOLUTION:

First, we can use the formula:


  • \text{work} = \text{rate} * \text{time}

To solve for the rate, we can use:


  • \text{rate} = \frac{\text{work}}{\text{time}}

For the first scenario, we have:

  • 50 men
  • 300m wall
  • 20 days

We can use the formula to solve for their rate:


\text{rate}_1 = \frac{300\text{m}}{20\text{ days} * 50\text{ men}} = 0.3 \frac{\text{m}}{\text{day} \cdot \text{man}}

Now, let's solve for the time required for 25 men to build a 60m wall. We can use the rate from the first scenario to solve for the time:


\text{rate}_1 = \text{rate}_2


0.3 \frac{\text{m}}{\text{day} \cdot \text{man}} = \frac{60\text{m}}{\text{time} \cdot 25\text{ men}}


\text{time} = \frac{60\text{m}}{0.3 \frac{\text{m}}{\text{day} \cdot \text{man}} \cdot 25\text{ men}} = \boxed{8 \text{ days}}


\therefore 25 men can build a 60m wall in 8 days.