The cost of labour is R1245 and the cost of equipment renting is R250. Therefore, the total cost to produce 5 devices is R1245 + R250 = R1495.
The cost per device is R1495 / 5 = R299.
Therefore, the cost to produce 5 devices is R1495 and the cost per device is R299.