0 Comments
you can start by dividing the total length of the road by the distance that can be repaired per week:
13 km ÷ 3 1/2 km/week = 3.71 weeks
Rounding up, it will take 4 weeks to repair the entire 13 km stretch of road.
9.4m questions
12.2m answers