**22.5 days is the answer*
Let's assume that B can do the job alone in x days.
Then, according to the question, A can do the same job alone in (1/3)x days.
Also, we know that A takes 60 days less than B to finish the job, so:
(1/3)x = x - 60
Solving for x, we get:
x = 90
Therefore, B can do the job alone in 90 days and A can do the same job alone in (1/3) * 90 = 30 days.
To find out how long they take to finish the job together, we use the formula:
(AB)/ (A+B)
where AB is the product of their individual times and A+B is their combined time.
Plugging in the values, we get:
(30 * 90)/(30+90) = 22.5
Therefore, working together, they can finish the job in 22.5 days.
Answer: Option B - 22.5 days