Answer:
The correct equation representing the daily production cost for Blade-Z based on the number of skates manufactured is:
C(x) = 42x + 200
This equation takes into account the fixed costs of $200 a day (represented by the constant term) and the variable costs per pair of skates, which is $42 (represented by the coefficient of x).