Answer:
2 hours 44 minutes
Explanation:
call Gina G, and call Rudy R.
let 1 represent 100% of the job completed.
Gina can do it in 5 hours. So 5G = 1
Rudy can do it in 6 hours. So 6R = 1
Multiply 5G = 1 by 6:
30G = 6.
Multiply 6R = 1 by 5:
30R = 5.
we now have 30G = 6 and 30R = 5.
add these together:
30G + 30R = 5 + 6
30 (G + R) = 11
we want the right side to be 1 (because 1 is 100% of the job completed).
divide both sides by 11:
(30/11) (G + R) = 1.
that means it takes Gina AND Rudy, working together, 30/11 hours
= 2.7272 hours
= 2 hours and 44 minutes (to nearest minute)