Answer: Therefore, the team was producing 10 parts per hour prior to switching to the new technology.
Step-by-step explanation:Let's denote the number of parts produced per hour before the technology upgrade by x.
After the upgrade, the team produces 6 more parts per hour than before, so their new production rate is x + 6 parts per hour.
In 8 hours, the team produces 8x parts in total.
In 6 hours with the new technology, the team produces 120% of what they previously produced in 8 hours, or 1.2(8x) = 9.6x parts in total.
We can set up an equation based on the information above:
6(x + 6) = 9.6x
Simplifying the equation:
6x + 36 = 9.6x
Subtracting 6x from both sides:
36 = 3.6x
Dividing both sides by 3.6:
x = 10