First, we need to calculate the total amount of time the machine runs each day:
Starting time: 09:30
Ending time: 16:10
We can convert the starting time and ending time to minutes:
09:30 = 9 x 60 + 30 = 570 minutes
16:10 = 16 x 60 + 10 = 970 minutes
The total running time of the machine is:
970 - 570 = 400 minutes
Since the machine produces a bolt every 8 seconds, we need to convert the running time from minutes to seconds:
400 x 60 = 24,000 seconds
Finally, we can calculate the number of bolts produced by dividing the total running time by the time it takes to produce one bolt:
24,000 / 8 = 3,000
Therefore, the machine produces 3,000 bolts each day.