116k views
3 votes
Which equation represents the length of the completed tunnel based on the number of days since TBM was introduced?

1 Answer

4 votes

Answer: Y = 45x + 140

Explanation:

which equation represents the length of the completed tunnel based on the number of days since tbm was introduced? the answer is y = 45x + 140

User Smendola
by
7.7k points