Answer:
x + 3x + 5x = 180
9x = 180
x = 20
20 kg cement, 60 kg sand, 100 kg gravel
Talil does not have enough cement (he has only 15 kg cement--he needs 20 kg cement). He does have enough sand and gravel.
9.4m questions
12.1m answers