labour hour rate × time required for one product.
Step-by-step explanation:
multiply the labor hourly rate by the time required to complete one unit of a product
eg: hr rate = $15.50 and it takes 0.1hr to manufacture the product. (15.50×0.1) = $1.55 which is the direct labor cost .