133k views
5 votes
Juan spent 10 minutes on his history homework and 3 minutes per question on his math homework. Which graph shows the total homework time, t, related to the number of math questions, q?

Discrete graph on a coordinate plane shows number of math questions, numbered 1 to 8 along the horizontal axis, and total homework time, numbered 5 to 40, on the vertical axis. Solid circles appear at points (0, 10), (1, 13), (2, 15), (3, 19), (4, 22), (5, 25), (6, 29), (7, 32), (8, 34).

Continuous graph on a coordinate plane shows number of math questions, numbered 1 to 8 along the horizontal axis, and total homework time, numbered 5 to 40, on the vertical axis. Solid circles appear at points (0, 10), (1, 13), (2, 15), (3, 19), (4, 22), (5, 25), (6, 29), (7, 32), (8, 34).

Discrete graph on a coordinate plane shows number of math questions, numbered 1 to 8 along the horizontal axis, and total homework time, numbered 3 to 24, on the vertical axis. Solid circles appear at points (0, 0), (1, 3), (2, 6), (3, 9), (4, 12), (5, 15), (6, 18), (7, 21), (8, 24).

User Geeky Guy
by
7.7k points

2 Answers

2 votes

Answer: Its A (the one all the way to the left)

explanation: Just guessed

User Kulesa
by
8.6k points
7 votes

Answer:Graph attached below. : Given : Juan spent 10 minutes on his history homework and 3 minutes per question on his math homeworkWe have to plot the graph that shows the total homework time, t, related to the number of math questions, q.Since, t denotes the total homework time taken by Juanand q denotes the number of math questions done by JuanThen we can represent the situation using a linear equation.Since he spent 10 minutes on his history homework and 3 minutes per question on his math homework.Then q questions take 3q timeand 10 minutes are fixed so, Total time is given by equation t = 10 + 3qAnd graph for the equation is attached below.

Explanation:

User Benubird
by
7.8k points