Final answer:
The output when three workers are hired for the firm is 13 units.
Step-by-step explanation:
The marginal cost of each worker hired is constant at $40. The average total cost when three workers are hired is $50. To find the output when three workers are hired, we can use the relationship between marginal cost (MC), average total cost (ATC), and output. Since MC equals ATC at the minimum point of the ATC curve, we know that the output when three workers are hired is the same as the output at the minimum point of the ATC curve. Therefore, to find the output when three workers are hired, we need to find the minimum point of the ATC curve.
Let's assume that the output when three workers are hired is Q units. The total cost (TC) of producing Q units can be calculated using the formula:
TC = FC + (MC * Q)
Given that the fixed cost (FC) is $130, the marginal cost (MC) is $40, and the average total cost (ATC) when three workers are hired is $50, we can set up the equation:
$130 + ($40 * Q) = $50 * Q
Simplifying the equation:
$130 + $40Q = $50Q
$10Q = $130
Q = $130 / $10
Q = 13
Therefore, the output when three workers are hired is 13 units.