Find the total labour charges for a job that takes; 2 1/2hours Time (h) 1/2 1 2 3 4 Charges 1,200 1400 1 800 2,200 2,600​

User CRDave
by
8.5k points

1 Answer

5 votes

Answer:

The total labor charges for the job are P3,500.

Explanation:

To find the total labor charges for a job that takes 2 1/2 hours, we need to look at the labor charges for each hour and a half-hour fraction and add them up.

For the first hour, the charges are P1,200. For the second hour, the charges are P1,400. For the third hour (the half-hour fraction), the charges are P1,800 / 2 = P900.

So, the total labor charges for 2 1/2 hours of work are

P1,200 + P1,400 + P900 = P3,500

Therefore, the total labor charges for the job are P3,500.