Final answer:
The statement is false. Operations sequence analysis is about optimizing the operational sequence rather than facility layout, which focuses on improving flow distance by arranging departments.
Step-by-step explanation:
The statement about the procedure known as operations sequence analysis improving flow distance in a process layout by arranging the relative location of departments is false. Operations sequence analysis connects more to the logical sequence of operations within a facility and the optimization of that sequence for efficiency. The procedure to improve flow distance in a process layout by arranging the relative location of departments is referred to as facility layout design or layout planning. This involves determining the most efficient physical arrangement of machinery, equipment, and departments within a facility.
The goal of layout planning is to minimize waste, reduce travel time for materials and workers, and enhance the overall workflow of the operations. A design that permits flexibility in the sequencing of lab activities to correlate with the lecture schedule exemplifies a strategy to improve the effectiveness of the teaching environment, but it is different from the goals in a manufacturing or service environment context where improving the process layout is in focus.