Final answer:
The man who lost the Niagara Falls contract built his own power station on the American side to recover from his setback.
Step-by-step explanation:
The man who lost the Niagara Falls contract attempted to win despite this setback by c) building his power station on the American side of the falls.
This allowed him to generate electricity and offer it to businesses and residents in the area. By doing so, he created competition for the Niagara Falls contract and still found a way to be successful in the industry. This demonstrates his resilience and determination to overcome setbacks in his business.
The man who lost the Niagara Falls contract attempted to win despite this setback by building his power station on the American side of the falls.
This historical event is more business and ingenuity-driven rather than action-based, such as launching a propaganda campaign or suing officials. After his initial failure, he focused on leveraging the resources available to him in the United States to still have a stake in the harnessing of Niagara Falls' immense power.
While this specific narrative about the man and his efforts after losing the contract is not directly addressed in the provided information, the answer can be inferred from the historical context of industrialization and entrepreneurship during the time.