Final answer:
The timing for a pre-application for examination to be dated depends on the specific examination and governing body. Although 90 days is a common timeframe for such applications, one should always consult the specific guidelines provided for the examination they are interested in.
Step-by-step explanation:
The question about when a pre-application for an examination needs to be dated is specific to regulatory or credentialing processes which may differ by jurisdiction, profession, or certifying body. However, generally speaking, an application for an examination should be submitted within a stipulated time frame prior to the examination date to ensure processing and confirmation of eligibility to sit for the exam. The options provided suggest different time frames, and without specifying the particular examination or governing body, the main answer can't be determined definitively. It is essential to refer to the specific examination's instructions or guidelines for the correct timing. However, if we were to make an educated guess, option B) 90 days before the examination is a common time frame for many professional examinations, though this is not universally applicable.Organizations typically require a pre-application to be submitted well before the examination date to manage scheduling, venue planning, and to confirm the candidate's eligibility. For example, a licensing board for professional engineers may have a different requirement from a medical board certifying doctors. Therefore, it is imperative to review the specific requirements outlined by the relevant examination body for the correct submission time.In conclusion, always verify the pre-application submission date specific to the examination you're planning to take by consulting the official materials provided for that examination. Assuming without verifying could lead to missing crucial deadlines.