Which person is responsible for the building and operation of stage machinery and scenery; scheduling lighting and industrial crews; moving scenery in and out of the theatre; and establishing policies and directives for scene shifting?

A) technical director
B) dramaturg
C) production manager
D) director

1 Answer

5 votes

Final answer:

The Technical Director is responsible for the construction and operation of stage machinery and scenes, coordinating technical crews, and overseeing scenery movement in theatre production.

Step-by-step explanation:

Responsibilities in Theatre Production

The person responsible for the building and operation of stage machinery and scenery, the scheduling of lighting and industrial crews, the moving of scenery in and out of the theatre, and the establishment of policies and directives for scene shifting is the Technical Director (Option A). The Technical Director ensures that all aspects of the production's technical elements, such as set construction, sound, props, and lighting, are safely, economically, and efficiently managed. They collaborate with the set designer to create building plans for the required scenic pieces, considering the budget, material availability, labor resources, and time constraints.

The Technical Director is also supported by the Assistant Technical Director (ATD), who helps maintain the shop equipment inventory and ensure that tools are in good working order.

In contrast, other roles like the stage manager, director, and producer have different functions within a production. The stage manager oversees rehearsals and, once the show opens, runs the performances. The director makes the artistic choices and stages the production, whereas the producer handles the financial and logistical aspects. It's important to note that during the run of a production, should any changes be needed, the stage manager typically handles these rather than the director.