40.6k views
2 votes
Your buyer purchases a 32 acre parcel of land on which he plans to build a manufacturing facility with a large warehouse. Site location of development law requires that before building commences he must receive a permit from:

A) Town Zoning Board.
B) Maine Department of Environmental Protection (DEP).
C) Local Building Inspector.
D) Local Chamber of Commerce.

User CopyrightC
by
8.3k points

1 Answer

1 vote

Final answer:

The buyer of the land needs to obtain a permit from the Local Building Inspector before building the manufacturing facility and large warehouse.

Step-by-step explanation:

Based on the provided information, the buyer of the 32 acre parcel of land would need to obtain a permit from the Local Building Inspector before commencing with the construction of the manufacturing facility and large warehouse. The Local Building Inspector is responsible for ensuring that the construction plans comply with building codes and safety regulations. They will review the plans, inspect the site, and issue the necessary permits if everything meets the requirements.

User Wit
by
8.2k points