55.4k views
5 votes
What is the maximum amount of calendar days following a non compliant inspection that follow up inspection shall be completed? (Page 158)

User Btel
by
8.3k points

1 Answer

6 votes

Final answer:

The maximum amount of calendar days for a follow-up inspection after a non-compliant inspection is typically regulated by law.

Step-by-step explanation:

In the context of non-compliant inspections, the maximum amount of calendar days following a non-compliant inspection for a follow-up inspection is typically specified by laws and regulations.

Without further details from Page 158, it is difficult to provide a specific answer. However, in many jurisdictions, follow-up inspections are required to be completed within a certain time frame, such as 30 days, 60 days, or 90 days, depending on the severity of the non-compliance.

These time frames are designed to ensure that corrective actions are taken promptly to address any identified issues.

User DamienMiheev
by
8.1k points