Which method may NOT be used to estimate reproduction cost?

a. quantity survey
b. economic age-life
c. unit-in-place
d. comparative unit

1 Answer

4 votes

Final answer:

The method that may NOT be used to estimate reproduction cost is unit-in-place.

Step-by-step explanation:

The method that may NOT be used to estimate reproduction cost is c. unit-in-place. This method is not used to estimate reproduction cost, but rather to estimate the cost of replacing an existing asset with a new one. Quantity survey, economic age-life, and comparative unit are all methods that can be used to estimate reproduction cost.