Major requirements management activities include

1. Version Control
2. Change Control
3. Test Trackings
4. Requirement Status Trackings
5. Requirement Tracking
A 1.2.4.5
B 2.3.4.5
C 1.3.4.5
D 1.2.3.4

User Fpmurphy
by
7.7k points

1 Answer

1 vote

Final answer:

The major requirements management activities include Version Control, Change Control, Requirement Status Tracking, and Requirement Tracking, which correspond to answer option A (1, 2, 4, 5). Test Tracking is not considered a core requirements management activity. Option A

Step-by-step explanation:

The question refers to major activities involved in requirements management, which is a crucial aspect in project management and systems engineering. The activities listed are part of the process that ensures a project meets the needs for which it was conceived. The correct major requirements management activities include:

Version Control - Keeping track of the different versions of requirements documentation.

Change Control - Managing changes to the requirements through a formal process that includes impact assessment, approvals, and documentation.

Requirement Status Tracking - Monitoring the development and fulfillment status of each requirement throughout the project lifecycle.

Requirement Tracking - Ensuring that all requirements are accounted for and traceable throughout the project.

Therefore, the correct answer is option A, which includes activities 1, 2, 4, and 5. Test Tracking is not typically considered a core activity of requirements management, hence it is not included in the correct answer. Option A