Final answer:
The total cost for job 450 is calculated by adding the direct materials, direct labor, and manufacturing overhead costs. The direct materials cost is $2,108, direct labor is $648 (36 hours × $18/hour), and overhead is $5,850 (234 hours × $25/hour), totaling to $8,606.
The correct answer is d. $8,606
Step-by-step explanation:
To calculate the total cost for job 450, we need to add the direct materials cost, direct labor cost, and applied manufacturing overhead. Given the direct materials cost as $2,108, we compute direct labor cost by multiplying the number of labor-hours (36) by the direct labor wage rate ($18 per hour). This gives us a total direct labor cost of $648. The applied manufacturing overhead is calculated by multiplying the machine-hours (234) by the predetermined overhead rate ($25 per machine-hour), which results in $5,850. Adding these amounts together, the total cost for job 450 comes to:
Direct materials cost: $2,108
Direct labor cost: $648 (36 hours × $18/hour)
Manufacturing overhead: $5,850 (234 hours × $25/hour)
When we sum these costs, we get:
Total cost = Direct materials cost + Direct labor cost + Manufacturing overhead
Total cost = $2,108 + $648 + $5,850
Total cost = $8,606.
Therefore, the correct option for the total cost on the job cost sheet is $8,606.