20.2k views
0 votes
Once the destructive changes ___ is finished, you will find the deleted components flagged as ___ in the ___ and any other ___, if it was ___ the deleted component, flagged as ___.

A) Revision; Removed; Version control; Previous versions; Modified; Added
B) Deletion; Erased; Document history; Current drafts; Edited; Replaced
C) Process; Excluded; File directory; Associated files; Altered; Intact
D) Transformation; Altered; Change log; Linked files; Included; Unmodified

1 Answer

7 votes

Final answer:

The correct answer is A) Revision; Removed; Version control; Previous versions; Modified; Added.

Step-by-step explanation:

The correct answer is A) Revision; Removed; Version control; Previous versions; Modified; Added.

In software development, version control is a system that allows multiple users to collaborate on a project, keeping track of changes and providing the ability to revert back to previous versions if needed. When a destructive change is made, such as deleting a component, this change is recorded in the version control system. The deleted component is flagged as 'Removed' in the revision history, allowing users to view the previous versions and understand the modifications made to the project.

User Bullionist
by
7.8k points