What types of documents must the architect provide after the contract documents have been issued?

User Perrin
by
8.1k points

1 Answer

3 votes

Final answer:

After the contract documents have been issued, the architect must provide construction documents, final design documents, and record documents.

Step-by-step explanation:

After the contract documents have been issued, the architect is required to provide several types of documents. These include:

  • Construction documents: These include detailed drawings and specifications that provide instructions for contractors to follow during the construction phase.
  • Final design documents: These documents show the approved design and any modifications made during the design process.
  • Record documents: These documents capture and record any changes made during the construction process, such as as-built drawings and change orders.