Final answer:
The contractor is responsible for installing the esc plans as per the construction specifications after the construction starts.
Step-by-step explanation:
The statement is true. In construction projects, architectural and engineering plans known as "esc plans" are developed prior to the construction phase to guide the construction process. These plans include specific details and specifications that are important for the successful execution of the project.
The contractor, who is responsible for carrying out the construction work, is tasked with following these plans and specifications. They must install various components of the project according to the specific requirements outlined in the esc plans to ensure that the construction is done correctly and meets the necessary standards.
For example, the esc plans could include details about the placement of structural elements, installation of electrical and plumbing systems, and other specific construction methods. It is the contractor's responsibility to interpret and implement these plans accurately during the construction process.