What are the layers of TPM #115 Standard Troweled Mortar Floor System?

1) Primer, Troweled Mortar, Topcoat
2) Basecoat, Primer, Topcoat
3) Troweled Mortar, Basecoat, Topcoat
4) Topcoat, Basecoat, Primer

User Excelguy
by
8.4k points

1 Answer

2 votes

Final answer:

The layers of TPM #115 Standard Troweled Mortar Floor System are Primer, Troweled Mortar, and Topcoat, in that order.

Step-by-step explanation:

The layers of TPM #115 Standard Troweled Mortar Floor System consist of three main components. These are Primer, Troweled Mortar, and Topcoat. The correct sequence is to apply the primer first, which serves as an adhesive layer to the substrate and provides a sound surface for the other layers to bond. After the primer, the troweled mortar is applied. This is a thick layer that provides the majority of the floor's strength and impact resistance. Finally, the topcoat is applied to seal the system, providing chemical resistance and a cleanable surface.