If the owner suspends the project for more than ____ days for reasons other than the fault of the arch, the arch may ____ by ____?

User TZHX
by
7.7k points

1 Answer

4 votes

Final answer:

If the owner suspends the project beyond a stipulated period for reasons not caused by the architect, the architect may have the right to terminate the contract or suspend their services after that duration, which is typically specified in the contract.

Step-by-step explanation:

If the owner suspends the project for more than a specific number of days for reasons other than the fault of the architect (arch), the architect may terminate the contract or suspend services. The exact duration after which the architect has this right, and the correct procedure to follow, will be detailed in the contract documents and usually stipulated by industry standards or regulations. For instance, in the American Institute of Architects (AIA) standard form agreements, there is often a clause that allows the architect to suspend services if the project is halted for a certain period, such as 30 days or more. It is crucial to review the contract to determine the specified period and the rights that are afforded to the architect under such circumstances.

User SHT
by
8.4k points