180k views
0 votes
Prior to placing the LS in remote, the crew chief must receive permission from the ECS. True or Falsse?

User Kenshinman
by
7.8k points

1 Answer

1 vote

Final answer:

It is true that the crew chief must obtain permission from the ECS before placing the LS in remote, as this is a standard safety protocol within aerospace or military operations to ensure system readiness and safety.

Step-by-step explanation:

The statement that the crew chief must receive permission from the ECS before placing the LS (Launch Sequence/Support systems) in remote, is true. In engineering practices, especially in aerospace and military settings, ECS stands for Environmental Control System, which is critical for ensuring the safety and proper environmental conditions for equipment and personnel.

The procedure typically requires a series of checks and balances, including obtaining clearances from various control authorities such as the ECS, to ensure that all systems are functioning correctly before any remote operations are initiated. Adherence to protocol is crucial to prevent mishaps and ensure the safety and success of operations involving sensitive and potentially dangerous systems.

User Jeremy Meadows
by
7.5k points

Related questions

asked Oct 2, 2024 170k views
Sondes asked Oct 2, 2024
by Sondes
8.1k points
1 answer
0 votes
170k views
asked Jun 22, 2024 210k views
Smhx asked Jun 22, 2024
by Smhx
8.2k points
2 answers
1 vote
210k views