Final answer:
To estimate max workload using a chart, analyze the data and identify the highest value in the chart.
Step-by-step explanation:
To estimate max workload using a chart, we need to analyze the data presented in the chart. Look for the highest value in the chart, as that represents the maximum workload. For example, if the chart represents different workloads for different time periods, the maximum workload would be the highest workload value shown in the chart.
Let's say we have a chart that shows the workload for different days of the week. The workload values are: 8 hours, 6 hours, 10 hours, 7 hours, 9 hours. In this case, the maximum workload would be 10 hours, as it is the highest value in the chart.
By identifying the highest value in the chart, we can estimate the maximum workload based on the data provided.