Include a risk analysis
Each work package should include a noun and a verb
Think Hierarchically
Target low-level tasks with 8-80 hours duration
Options A, B, C and E
The following represent best practices in developing a work breakdown structure (WBS):
Include a risk analysis: Incorporating a risk analysis helps in identifying potential risks associated with different tasks or components within the WBS.
Each work package should include a noun and a verb: Work packages should be clearly defined using specific actions (verbs) and deliverables (nouns) to ensure clarity and understanding.
Think Hierarchically: Organize the WBS in a hierarchical manner, breaking down larger tasks into smaller, manageable components.
Target low-level tasks with 8-80 hours duration: Work packages should be of a manageable size, typically falling within the range of 8 to 80 hours for effective planning and execution.