For most of the work, concrete is proportioned with batching. If an error is reported in batching, it is related to __________________.

User Pkanev
by
8.1k points

1 Answer

7 votes

Final answer:

Batching errors in concrete are related to incorrect proportioning of ingredients.

Step-by-step explanation:

When batching concrete, various ingredients such as cement, sand, aggregates, and water are combined in specific ratios to achieve the desired concrete mix. If an error is reported in batching, it is related to the incorrect proportioning of these ingredients.

For example, if too much water is added during batching, the concrete will become more fluid and may have reduced strength. On the other hand, if insufficient cement is added, the concrete may not have enough binding properties, resulting in weaker structural integrity.

It is essential to follow precise batching procedures and carefully measure the quantities of each ingredient to ensure the concrete mix meets the required specifications and performance criteria.