Phase of Development 3: Recording the subdivision plat map

a. Land Acquisition
b. Site Preparation
c. Infrastructure Development
d. Final Plat Approval

User Donlynn
by
7.8k points

1 Answer

2 votes

Final answer:

The Phase of Development 3 entails several stages in land development, including creating a plat map that shows the division of land into lots and streets, preparing the site, developing infrastructure, and obtaining final plat approval from local authorities.

Step-by-step explanation:

The Phase of Development 3: Recording the subdivision plat map is a crucial step in the land development process that embodies different stages such as land acquisition, site preparation, infrastructure development, and final plat approval. This phase entails creating an official subdivision plat map, which is a detailed drawing representing the division of land into lots, blocks, streets, and public areas, complying with local governmental regulations and land-use ordinances. After land developers have gone through the process of buying the land and drafting tentative maps, they must proceed with site preparation which includes clearing, grading, and installing necessary utilities. Once these steps are met, the infrastructure development stage takes place, involving the construction of roads, sidewalks, and other necessary infrastructure. The concluding step is securing the final plat approval from the local governing authorities, which signifies compliance with the master plan and allows for the sale of lots and the construction of buildings.

User Simeg
by
9.0k points