If following lockout/tagout procedures, what step should be taken BEFORE you shut down the equipment?

Option 1: Notify your supervisor
Option 2: Isolate energy sources
Option 3: Shut down the equipment
Option 4: Perform a risk assessment

User Jahed
by
9.2k points

1 Answer

6 votes

Final answer:

Prior to equipment shutdown in lockout/tagout procedures, a risk assessment should be performed to identify hazards and plan for safe isolation. Safety equipment location knowledge is also crucial.

Step-by-step explanation:

Before shutting down the equipment when following lockout/tagout procedures, the step that should be taken is to perform a risk assessment. This is crucial to identify potential hazards and determine the correct method of safely isolating the equipment. It ensures that any risks associated with the shutdown like release of stored energy or unexpected equipment startups are properly identified and mitigated. Additionally, knowing the location of safety equipment such as fire extinguishers and eyewash stations, as well as handling of sharp objects, chemicals, heat, and electricity, are important aspects of laboratory safety that help maintain a secure environment.

User Floum
by
8.8k points