Which of the following statements is most accurate?

A.) The reproduction cost method is easier to use, and more practical.

B.) The reproduction cost method is easier to use, but it is less practical.

C.) The reproduction cost method uses current material and design standards, based on the current prices for materials and labor.

D.) The reproduction cost method uses the cost of constructing an exact duplicate of the subject building based on actual historical construction prices.

1 Answer

3 votes

Final answer:

The reproduction cost method uses current material and design standards, based on the current prices for materials and labor.

Step-by-step explanation:

The most accurate statement is option C.) The reproduction cost method uses current material and design standards, based on the current prices for materials and labor.

This method calculates the cost of constructing an exact duplicate of a building using the current market prices for materials and labor. It takes into account any changes in material prices, design standards, and labor costs that have occurred since the original building was constructed.

For example, if the cost of materials has increased since the original building was constructed, the reproduction cost method would take into account these higher prices in its calculation. This method provides a more accurate estimate of the current cost to construct a duplicate building.

User Snieguu
by
7.6k points