Final answer:
The time taken to generate a load-based schedule can vary and depends on multiple factors such as complexity and system processing power.
Step-by-step explanation:
The load-based schedule generation time can vary depending on multiple factors, including the complexity of the schedule and the processing power of the system generating it. Therefore, the length of time to generate a load-based schedule cannot be determined solely based on the moon phase or specific timestamps like noon. It can range from a few seconds to several minutes, depending on the specifics of the scheduling process.